Wednesday, May 9, 2012


sbcc
Meeting Notice
The Energy Code Technical Advisory Group is scheduled to meet on Thursday, May 17 from 9 am to 1 pm. The meeting will be held at the Seattle Area Pipe Trades Education Center, and a telephone conference bridge and WebEX site will also be available.
For information on how to join via telephone or internet, check the website or contact Krista Braaksma at (360) 407-9278.
The agenda and other meeting materials can be viewed on the TAG website at https://fortress.wa.gov/ga/apps/sbcc/Page.aspx?nid=116
   

Tuesday, May 8, 2012


Advanced Energy Design Guidance Offered for Large Hospitals

ATLANTA—A dose of guidance to help save energy in hospitals is prescribed by the newest Advanced Energy Design Guide (AEDG), written by a group of leading building industry organizations.

The AEDG for Large Hospitals is the fourth in the series, designed to provide recommendations for achieving 50% energy savings when compared with the minimum code requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings.

The book was developed by a committee representing a diverse group of energy professionals drawn from ASHRAE, the American Institute of Architects (AIA), the Illuminating Engineering Society (IES), the Department of Energy (DOE) and the United States Green Building Council (USGBC).

“Most important in the Advanced Energy Design Guide for Large Hospitals is the recognition that patient outcomes, safety and experience trump all cost- and energy-saving strategies,” Shanti Pless, chair of committee that wrote the guide, said. “However, a well designed, constructed, operated and maintained facility is a major contributor to the environment of care and can improve patient outcomes, safety and comfort.”

The Guide focuses on standard mid-to-large-size hospitals that would typically be at least 100,000 square feet in size but the strategies apply to all sizes and classifications of large hospitals. Space types covered include conference, lobby, lounge and office areas; reception/waiting areas and examination and treatment rooms; clean and soiled workrooms; nurse stations, nurseries, patient rooms; operating rooms, procedure rooms, recovery rooms and sterilizer equipment areas; pharmacies and laboratories; triage, trauma and emergency rooms; physical therapy and radiology/imaging rooms; and storage, receiving and mechanical/electrical/telecom rooms.

Included in the Guide are recommendations for the design of the building opaque envelope; fenestration; lighting systems; HVAC systems; building automation and controls; outdoor air requirements; service water heating; measurement and verification; and plug and process loads, including kitchen equipment.

Along with whole building and technology case studies, the Guide highlights that existing reliable technologies and design philosophies can be used to reduce energy, according to Pless. Some of the technologies and philosophies highlighted in the book include:
•       Use of shape and form to give  access to daylighting in spaces that usually have no windows
•       Daylighting of staff areas and publics spaces while at the same time specifying proper glazing to control solar gain
•       Elimination of reheat, which is the largest energy saver from the HVAC system. Other HVAC savings comes from the de-coupling of ventilation air treatment and space conditioning and the elimination of steam boilers
•       Recommendations to reduce and control plug and process loads including commercial kitchen equipment
•       Reductions in interior and exterior lighting
•       Recommendations involving LED surgery lights, which have the added benefit of allowing surgeons to set the thermostat higher in the operating rooms
•       Measurement and verification recommendations to demonstrate savings are being realized with the added benefit of helping solve operational issues

The 50% Advanced Energy Design Guide series follows an earlier series that provided guidance to achieve 30% savings. The ultimate goal is to provide guidance to achieve net zero energy buildings; that is, buildings that, on an annual basis, produce more energy than they consume.

Other books in the 50% savings series deal small to medium office buildings, K-12 schools and medium to big box retail buildings. Since the Guides first began to be offered as free downloads at the beginning of 2008, more than 400,000 have been downloaded.

For more information on the entire Advanced Energy Design Guide series, or to download a free copy, please visit www.ashrae.org/freeaedg. A print version of the Guide may be purchased for $82 ($69, ASHRAE members). To order, contact ASHRAE Customer Service at 1-800-527-4723 (United States and Canada) or 404-636-8400 (worldwide), fax 404-321-5478, or visit www.ashrae.org/bookstore.
                                      

Monday, April 30, 2012

Job Posting - ACI


ACI, a manufactures sales rep for mechanical and HVAC products is seeking an Estimator.

The Estimator position requires reviewing plans, specifications, and schedules, submitting substitutions requests, then stripping the plans leading to a quote to be sent out on the bid day. The work requires constant involvement with sales people, existing customers, management personnel, and includes software integration.

Key Responsibilities and Accountabilities:

Ÿ  Communication: ACI Seattle has an open cubical environment where communication is critical between the estimating department, sales staff, and customers.

Ÿ  Planning/Organizing:  Must be able to prioritize upcoming jobs to be bid and meet deadlines.  Time management is critical.

Ÿ  Project Management: Perform bid follow up. Contact engineering firms for product approvals prior to bidding.


An ideal candidate must posses the following traits:

Ÿ  4+ years estimating experience in the mechanical and HVAC field.
Ÿ  Preferably specialty experience with GRD’s, Fans, Dampers, AHU’s, etc.
Ÿ  Out going personality with excellent communication skills.
Ÿ  Detail oriented with a technical background in accounting or construction management.
Ÿ  Energetic, positive attitude with a fresh approach.
Ÿ  Computer literate and adaptable to new software programs.
Ÿ  Ability to work in a high-pressure environment with strict deadlines.

ACI has been in business for 27 years, over 30 employees and has two office locations.  We have excellent compensation with benefit package that includes health insurance, vision, dental, 401K, and profit sharing.  We have an energetic and fun office environment.  As a testament to our quality work environment, the average tenure of an ACI employee is greater than 12 years.  If you are interested in working for ACI, please contact:

Brian Wolford

sbcc
Meeting Notice
The Washington State Building Code Council meeting scheduled for May 11 has been cancelled. The next scheduled Council meeting is June 8, 2012.
The Building, Fire and Plumbing Codes (BFP) Committee and Mechanical, Ventilation and Energy (MVE) Codes Committee are scheduled to meet. The  BFP Committee is scheduled to meet on Thursday, May 10 from 10 am to 1 pm. The MVE Committee will meet on Friday, May 11 from 9 am to 3 pm. Both meetings will be held at Shoreline City Hall, and a telephone conference bridge and WebEX site will also be available.
For information on how to join via telephone or internet, please contact Council staff at (360) 407-9280 prior to the meeting dates.
The agenda and other meeting materials can be viewed on the Council website at https://fortress.wa.gov/ga/apps/SBCC/Default.aspx
   

sbcc
Meeting Notice
The Energy Code Technical Advisory Group is scheduled to meet on Thursday, May 3 from 9 am to 3 pm. The meeting will be held at the Seattle Area Pipe Trades Education Center, and a telephone conference bridge and WebEX site will also be available.
For information on how to join via telephone or internet, please contact Krista Braaksma at (360) 407-9278 or check the website next week.
The agenda and other meeting materials can be viewed on the TAG website at https://fortress.wa.gov/ga/apps/sbcc/Page.aspx?nid=116
   

sbcc
Meeting Notice
The Mechanical Code Technical Advisory Group is scheduled to meet on Wednesday, May 2 from 10 am to 3 pm. The meeting will be held at the Seattle Area Pipe Trades Education Center, and a telephone conference bridge and WebEX site will also be available.
For information on how to join via telephone or internet, please contact Krista Braaksma at (360) 407-9278 or check the website next week.
The agenda and other meeting materials can be viewed on the TAG website at https://fortress.wa.gov/ga/apps/sbcc/Page.aspx?nid=119
   

sbcc
Meeting Notice
The Plumbing Code Technical Advisory Group is scheduled to meet on Friday, May 4 from 9 am to 1 pm. The meeting will be held at the Seattle Area Pipe Trades Education Center, and a telephone conference bridge and WebEX site will also be available.
For information on how to join via telephone or internet, please contact Krista Braaksma at (360) 407-9278 or check the website next week.
The agenda and other meeting materials can be viewed on the TAG website at https://fortress.wa.gov/ga/apps/sbcc/Page.aspx?nid=121